{"id":98287,"date":"2026-07-30T10:24:48","date_gmt":"2026-07-30T03:24:48","guid":{"rendered":"https:\/\/montmari-asia.com\/blog\/98287\/"},"modified":"2026-07-30T10:24:48","modified_gmt":"2026-07-30T03:24:48","slug":"real-estate-in-thailand-how-to-tell-a-real-construction","status":"publish","type":"post","link":"https:\/\/montmari-asia.com\/en\/blog\/98287\/","title":{"rendered":"Real Estate in Thailand: How to Tell a Real Construction Project from a Pretty Rendering"},"content":{"rendered":"<h2>What you need to know in 30 seconds<\/h2>\n<ul>\n<li>We checked 46 projects and rumors used between 2018 and 2026 to sell real estate in Pattaya, Jomtien and Bang Saray. Result: 19 confirmed, 16 announced, 11 phantoms.<\/li>\n<li><strong>ICON SIAM in Jomtien<\/strong> is a phantom. The 2019 primary source is not an investor but the president of a local business association, and the quote is about a &#8220;study.&#8221; Siam Piwat has never once mentioned Pattaya.<\/li>\n<li><strong>Legoland, Peppa Pig and an oceanarium in Pattaya<\/strong> - all three trace back to a single Thai Facebook page post from 27.11.2021. Merlin Entertainments has no projects in Thailand whatsoever.<\/li>\n<li><strong>&#8220;Universal in Pattaya&#8221;<\/strong> is actually a <em>preliminary agreement<\/em> for a DreamWorks-themed water park. There is no disclosure of the deal on the SET stock exchange.<\/li>\n<li><strong>Aquatique District<\/strong> - 0% built after 5 years, budget grew from 10 to 30+ billion \u0e3f, the first phase has disappeared from the lineup.<\/li>\n<li><strong>The high-speed rail<\/strong> - 8 years, 0 meters of track, 21.8 billion \u0e3f already spent. On 06.07.2026 the concessionaire itself filed notice to terminate the contract; a government decision is expected in August-September 2026.<\/li>\n<li>What is actually being built: U-Tapao airport (NTP issued 03.04.2026), U-Tapao&#8217;s second runway (completion 2028), the M7 off-ramp (2028), Laem Chabang port, and Jomtien beach nourishment (phase 2).<\/li>\n<\/ul>\n<p><em>All facts verified on 29 July 2026 against primary sources. Links are at the end of the article.<\/em><\/p>\n<hr \/>\n<h2>They show you an apartment and say: &#8220;Right here, they&#8217;re going to build\u2026&#8221;<\/h2>\n<p>The scenario is the same in every sales office in Pattaya. A view from the balcony, tea, a tablet full of renders. And the line: <em>&#8220;Look, right across the road there&#8217;s going to be an ICON SIAM.&#8221;<\/em> Or a Legoland. Or a high-speed rail station, 45 minutes to Bangkok.<\/p>\n<p>Then comes the arithmetic: since something big is coming nearby, the unit is worth more, and you should buy now before the price goes up.<\/p>\n<p>The problem is that &#8220;they&#8217;re building X nearby&#8221; isn&#8217;t a feature of the apartment - it&#8217;s a hypothesis. And it&#8217;s a hypothesis you pay for today, in full, while whether it actually comes true is something you&#8217;ll find out in five to ten years.<\/p>\n<p>And here&#8217;s what matters about the money. When you go to sell that apartment, your buyer will show up with the same questions. If by then &#8220;ICON SIAM across the road&#8221; is still just a five-year-old Facebook post, you won&#8217;t have that argument left - only the property itself: floor, view, condition, building, management company. Whatever you overpaid for the pretty picture, you&#8217;ll have to subtract from your own expectations.<\/p>\n<p>So we did something simple: we took 46 projects used to sell property in Pattaya and found the primary source for each one. Below is what held up under scrutiny - and what didn&#8217;t.<\/p>\n<hr \/>\n<h2>How we checked: the evidence scale<\/h2>\n<p>A news story is not proof. Nor is a press release. We rank sources by reliability and assign a verdict based on the highest level found.<\/p>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th>Level<\/th>\n<th>What it is<\/th>\n<th>Why it matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1<\/td>\n<td><strong>An open facility or physical construction<\/strong> - piling, machinery on site, a completion-percentage report from the client<\/td>\n<td>The only conclusive proof<\/td>\n<\/tr>\n<tr>\n<td>2<\/td>\n<td>A signed contract, especially one disclosed on the SET exchange<\/td>\n<td>The company carries legal liability for the disclosure<\/td>\n<\/tr>\n<tr>\n<td>3<\/td>\n<td>An EIA\/EHIA approved in the ONEP database<\/td>\n<td>Without an approved EIA, a major facility cannot legally be built in Thailand. The best early indicator<\/td>\n<\/tr>\n<tr>\n<td>4<\/td>\n<td>A Cabinet resolution, Royal Gazette entry, government contract, or BOI approval<\/td>\n<td>A legal fact. But an approved plan \u2260 allocated funding<\/td>\n<\/tr>\n<tr>\n<td>5<\/td>\n<td>A committee decision, public hearings<\/td>\n<td>A procedural step that often gets reversed<\/td>\n<\/tr>\n<tr>\n<td>6<\/td>\n<td><strong>An investor statement<\/strong> - a company press release<\/td>\n<td>Intent, not commitment<\/td>\n<\/tr>\n<tr>\n<td>7<\/td>\n<td>A statement by an official or an industry association<\/td>\n<td>Often a retelling of someone else&#8217;s plans<\/td>\n<\/tr>\n<tr>\n<td>8<\/td>\n<td>Press coverage, reprints, social media, anonymous sources<\/td>\n<td>A signal, not proof<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p>The difference between levels isn&#8217;t a technicality - it&#8217;s literally the difference between &#8220;it exists&#8221; and &#8220;it doesn&#8217;t.&#8221;<\/p>\n<p>An official&#8217;s statement \u2260 a Cabinet decision \u2260 a signed contract \u2260 construction that has actually started \u2260 an approved EIA.<\/p>\n<p>We read the primary source and look at whose quote it is and which verbs it uses. &#8220;A study is underway&#8221; is not &#8220;we are building.&#8221; &#8220;Preliminary agreement&#8221; is not a contract. We always check the Thai-language coverage as well: for Thai projects, the primary source is almost always Thai, and the English-language press gives a lossy retelling. We also separately check the date of the most recent news: if the last mention was in 2020-2022 and there&#8217;s been silence since, that&#8217;s a key sign of a phantom, no matter how loud the original announcement was.<\/p>\n<p>We also test negative hypotheses. Is Thailand among Merlin Entertainments&#8217; projects? Is Pattaya on depa&#8217;s list of certified smart cities? Absence from the official list is evidence too.<\/p>\n<hr \/>\n<h2>Myth 1. &#8220;They&#8217;re going to build an ICON SIAM in Jomtien&#8221;<\/h2>\n<p><strong>What&#8217;s claimed.<\/strong> A luxury shopping complex on the level of ICONSIAM on Na-Jomtien beach near Ocean Marina, with investment &#8220;exceeding 10 billion \u0e3f.&#8221;<\/p>\n<p><strong>What we found.<\/strong> The primary source is a REm Magazine article from 24 May 2019, a retelling of a Nation TV segment [1]. The key quote in it belongs to Ekasit Ngamphichet, president of the Pattaya Business and Tourism Association, and it&#8217;s far more cautious than the headline suggests: <em>&#8220;a study is underway for a major retail project from Iconsiam&#8217;s shareholders in the Jomtien area.&#8221;<\/em><\/p>\n<p>Let&#8217;s break the phrase down word by word. Not &#8220;Siam Piwat is building&#8221; - but &#8220;Iconsiam&#8217;s shareholders are looking into something.&#8221; And it wasn&#8217;t said by an investor, but by the head of a local business association - someone who hasn&#8217;t put a single baht into the project. The headline &#8220;including Icon Siam&#8221; is already the editor&#8217;s interpretation, not a quote.<\/p>\n<p>Siam Piwat has never confirmed Pattaya. ICONSIAM is a joint project of Siam Piwat, MQDC and Charoen Pokphand Group, opened in Bangkok on 9 November 2018. All of Siam Piwat&#8217;s communications from 2018-2026 are about ICONSIAM Bangkok, Siam Paragon, the Siam Discovery renovation, Siam Premium Outlets, and international expansion [3]. Not a single mention of Pattaya or Jomtien.<\/p>\n<p>The only trace in the mainstream press is anonymous. Bangkok Post, October 2023: part of a 40-rai plot would be allocated to an &#8220;Iconsiam Pattaya mall&#8221; - <em>&#8220;according to a source who asked not to be named&#8221;<\/em> [4]. After that: silence, for nearly three years.<\/p>\n<p><strong>Where the mix-up came from.<\/strong> That same 40-rai plot in Na-Jomtien does have a project with approved EIAs - but it&#8217;s residential. It&#8217;s The Worldmark (an MQDC \/ Chearavanont family structure): three towers - 64 floors \/ 381 units, 60 floors \/ 470 units, and 57 floors \/ 155 apartments plus 154 hotel rooms [4]. ICONSIAM and this plot share a common shareholder - CP\/MQDC. That&#8217;s where the similarity ends.<\/p>\n<p>In other words, the rumor didn&#8217;t grow out of nothing: there&#8217;s land, there&#8217;s an influential group, there&#8217;s an EIA. It&#8217;s just that the project on that land is a residential complex, not a shopping mall.<\/p>\n<p>It&#8217;s telling how the rumor kept living. Back in February 2020, the blog of developer Sisaran Group - an interested party selling condos in Bang Saray - wrote in plain language: <em>&#8220;The new project in Na-Jomtien has not yet been confirmed and has not been publicly announced; however, our sources indicate\u2026&#8221;<\/em> [2]. The author himself admits there was no announcement. What followed was a chain of reprints on real estate websites - minus that caveat.<\/p>\n<p><strong>Verdict: Phantom.<\/strong> No release from Siam Piwat, no SET disclosure, no BOI approval, no EIA for a retail facility. A purchase decision in <a href=\"https:\/\/montmari-asia.com\/en\/area\/na-jomtien-en\/\">Na-Jomtien<\/a> should not be built on &#8220;an ICON SIAM is coming here.&#8221;<\/p>\n<hr \/>\n<h2>Myth 2. &#8220;Aquatique will have Legoland, Peppa Pig and an oceanarium&#8221;<\/h2>\n<p><strong>What&#8217;s claimed.<\/strong> Legoland, a Peppa Pig park and a large aquarium will open inside Aquatique District on Pattaya beach.<\/p>\n<p><strong>What we found.<\/strong> All three &#8220;anchors&#8221; trace back to a single post on the Thai Facebook rendering page \u0e17\u0e35\u0e48\u0e0b\u0e38\u0e01\u0e2b\u0e31\u0e27\u0e19\u0e2d\u0e19 from 27 November 2021, which The Pattaya News reprinted that same day [13]. This is not a publication from the investor or from the IP rights holder - it&#8217;s a page of renders.<\/p>\n<p>AWC - the company that owns the site - has never named any of the three attractions:<\/p>\n<ul>\n<li><strong>March 2023<\/strong> - the lineup was announced as &#8220;a shopping mall, hotels, a theme park, a performance venue, a fish market&#8221; [6];<\/li>\n<li><strong>January 2026<\/strong> - &#8220;retail, a water park with a leading international partner, a wellness center&#8221; [7];<\/li>\n<li><strong>July 2026<\/strong> - a DreamWorks-themed water park in partnership with Universal [11].<\/li>\n<\/ul>\n<p>Merlin Entertainments - owner of both Legoland and the Peppa Pig parks - has not a single project in Thailand [14]. Legoland operates in Denmark, the US, Germany, the UAE, Japan, Korea, Malaysia, China and the UK. Peppa Pig parks: Florida (2022), G\u00fcnzburg (2024), Dallas (2025); the first in Asia - Shanghai - is planned for 2027 [16] [17]. Thailand doesn&#8217;t appear anywhere.<\/p>\n<p>There&#8217;s no aquarium in any AWC release - there it&#8217;s a water park. These are different facilities, and the two get conflated only in Russian-language retellings.<\/p>\n<p>Interestingly, the same 2021 renders were still being reprinted by the Thai trade press as late as February 2026 - with direct credit to that same Facebook page.<\/p>\n<p><strong>Verdict: Phantom, all three.<\/strong> And AWC&#8217;s July 2026 release effectively settles the question: the entertainment anchor at Aquatique is DreamWorks, not LEGO.<\/p>\n<hr \/>\n<h2>Myth 3. &#8220;AWC is building a Universal Studios in Pattaya&#8221;<\/h2>\n<p><strong>What&#8217;s claimed.<\/strong> Per July 2026 news reports - &#8220;Universal is coming to Thailand,&#8221; &#8220;Pattaya is getting a Universal.&#8221;<\/p>\n<p><strong>What we found.<\/strong> The primary source is an AWC press release from 8 July 2026 [11]. Its wording is extremely cautious, and this is exactly the case where every word matters:<\/p>\n<blockquote>\n<p><em>&#8220;AWC is exploring additional opportunities with Universal Destinations &amp; Experiences\u2026 The preliminary agreement between AWC and Universal is a first step toward creating two distinct projects.&#8221;<\/em><\/p>\n<\/blockquote>\n<p>The rest of the text is conditional: &#8220;would bring,&#8221; &#8220;the project would integrate.&#8221; Universal&#8217;s representative in the same release: <em>&#8220;we&#8217;re always interested in exploring new ways\u2026 We look forward to continuing to develop these opportunities.&#8221;<\/em><\/p>\n<p>What&#8217;s actually being discussed is not a Universal Studios park, but two separate things:<\/p>\n<ul>\n<li><strong>Bangkok<\/strong> - a Kung Fu Panda-themed zone inside AWC&#8217;s Yaowarat project (16 billion \u0e3f, first piling already done, opening 2029);<\/li>\n<li><strong>Pattaya<\/strong> - a DreamWorks-themed water park at Aquatique (DreamWorks is owned by NBCUniversal).<\/li>\n<\/ul>\n<p>There is no separate NBCUniversal release - the entire global reprint traces back to the AWC release. And crucially: AWC has not published any SET disclosure for this deal [12]. A public company is required to disclose material transactions. If there&#8217;s no disclosure, the company itself doesn&#8217;t consider the agreement material or binding.<\/p>\n<p><strong>Verdict: Announced.<\/strong> This is more than a rumor: the announcement comes from a real investor together with a real IP rights holder. But it&#8217;s a preliminary agreement with no date, budget, or commitments. The claim &#8220;Universal is being built in Pattaya&#8221; is not accurate.<\/p>\n<hr \/>\n<h2>Myth 4. &#8220;Aquatique is about to open&#8221;<\/h2>\n<p>Here it&#8217;s important to be fair: AWC is a real public company with a real balance sheet (2025: revenue 23.1 billion \u0e3f, net profit 6.4 billion \u0e3f, assets 218.7 billion \u0e3f). The 27-2-75-rai plot on Pattaya beach is real - the former site of the Grand Sole Hotel. Hotel management agreements with IHG (2023) and Marriott (2026, twice) have been signed and published.<\/p>\n<p>And yet:<\/p>\n<ul>\n<li><strong>Construction hasn&#8217;t started. 0%.<\/strong> As of 29.01.2026 the local press described the site as &#8220;a large empty space currently occupied by a big night market.&#8221;<\/li>\n<li><strong>The first promise has already been broken.<\/strong> The Vignette Collection Pattaya - 234 rooms, 1.9 billion \u0e3f - was supposed to break ground in 2022 and open in 2024 [9]. It&#8217;s absent from the 2026 brand lineup entirely.<\/li>\n<li><strong>The investment figure has changed four times:<\/strong> 10 billion \u0e3f (2021) \u2192 22 billion for all of Pattaya (2023) \u2192 &#8220;20,000 million&#8221; in the Thai press (February 2026) \u2192 over 30 billion (July 2026). Never once reconciled against the previous figure.<\/li>\n<li><strong>Timelines have drifted apart:<\/strong> Kimpton - 2028, Ritz-Carlton and phase one - 2031, Moxy - first quarter of 2033 [8] [10].<\/li>\n<li><strong>Not found:<\/strong> an EIA filing in the ONEP database for the facility, BOI approval, a building permit, or SET disclosure.<\/li>\n<\/ul>\n<p>A telling contrast: for its Yaowarat project, AWC issued a dedicated &#8220;Commences First Piling&#8221; release - they started piling, and they announced it. No equivalent release exists for Aquatique.<\/p>\n<p><strong>Verdict: Announced.<\/strong> The project is real and will likely happen. But the horizon is 2031-2033, not &#8220;any day now.&#8221; Advertising along the lines of &#8220;across the road from Aquatique, opening in a couple of years&#8221; doesn&#8217;t match the sources.<\/p>\n<hr \/>\n<h2>Myth 5. &#8220;The high-speed rail to Pattaya is about to launch&#8221;<\/h2>\n<p>The most persistent line in the local real estate lexicon. Let&#8217;s go through it date by date.<\/p>\n<p>The public-private partnership contract between SRT and Asia Era One (a CP Group entity) for the &#8220;three-airport&#8221; high-speed rail - Don Mueang, Suvarnabhumi, U-Tapao - was signed on 24 October 2019. Amount: 224.5 billion \u0e3f, 220 km, design speed 250 km\/h, 50-year concession.<\/p>\n<p>In 7 years, not a single meter of track has been built.<\/p>\n<p>On 6 July 2026 the concessionaire itself notified SRT of its intent to terminate the contract as of 1 October 2026 - under clause 6.2, citing failure to receive the full package of BOI benefits [42]. On 15 July the contract-management committee presented the EEC board with two options: amend the contract or terminate it [44].<\/p>\n<p><strong>The wording here matters critically.<\/strong> As of 29 July 2026 the contract has not formally been terminated. The private party initiated termination; the EEC board&#8217;s decision is expected in August 2026, and the Cabinet&#8217;s decision in September 2026. The claim &#8220;the contract has already been terminated&#8221; doesn&#8217;t match the sources. The accurate statement is: &#8220;the concessionaire has announced it is withdrawing, and the government&#8217;s decision is pending.&#8221;<\/p>\n<p>What has already been spent: 21.8 billion \u0e3f [41]. Of that, SRT accounts for more than 9.8 billion (5.74 billion for land acquisition, 4.103 billion for utility relocation), and the private party for more than 12 billion (Airport Rail Link upgrades and preparation).<\/p>\n<p>What&#8217;s being discussed as an alternative: on 5 July 2026, EECO Secretary-General Chula Sukmanop stated that the 250 km\/h design would be dropped in favor of a medium-speed 160 km\/h line on the existing meter gauge with electrification through to U-Tapao, with a timeline of about 4 years [43]. This is a statement and a plan, not a decision.<\/p>\n<p><strong>Verdict:<\/strong> as construction - Phantom (0 meters in 7 years). As a process - Announced, in a state of collapse. If a premium on a property&#8217;s price is justified by proximity to a future station in <a href=\"https:\/\/montmari-asia.com\/en\/area\/nong-prue-en\/\">Nong Prue<\/a>, there is nothing today to justify paying it for. A detailed breakdown is in a <a href=\"\/blog\/78481\/\">dedicated article in this series<\/a>.<\/p>\n<hr \/>\n<h2>Myth 6. Briefly: the rest<\/h2>\n<p><strong>Pattaya Monorail.<\/strong> The promise of &#8220;opening in 2026&#8221; was made back in 2020 as part of the &#8220;Neo Pattaya&#8221; program (3 lines, 34 km, roughly 50 billion \u0e3f). Fact as of July 2026: no EIA has been filed or approved. The last confirmed event was 20.11.2025, when Mayor Poramet said the assessment was &#8220;still being prepared&#8221; and &#8220;the whole process will take at least a year&#8221; [51]. There has been no news at all from January through July 2026. The monorail does not appear among the key points of the mayor&#8217;s re-election platform &#8220;Better Pattaya 2.0,&#8221; dated 28.06.2026. One additional detail: at 2024 hearings on the purple line, officials disclosed that 635 plots, 64 rai, and 461 structures would need to be expropriated [53] - resident opposition is blocking the EIA filing. And the anchor station of the green line is the very same high-speed rail terminal. - Announced as a program, Phantom as construction.<\/p>\n<p><strong>Pattaya Cable Car.<\/strong> Three lines, cabins for 10-12 people, launch promised for 2026. Source: a presentation by intermediary company Swiss Advice Co. to city officials on 13-15 December 2022 [36]. Pattaya Mail reported at the time that there was no feasibility study and no financing [35]. There has been no publication since 17.12.2022 - 3.6 years of silence. - Phantom.<\/p>\n<p><strong>&#8220;Disneyland in Thailand.&#8221;<\/strong> 300 billion \u0e3f, roughly 800 hectares in the EEC. Source: a statement by Deputy PM and Transport Minister Phiphat Ratchakitprakan, Nation Thailand, 12 February 2026 [18]. Disney has confirmed nothing. Five consecutive governments have relaunched this idea over the past 26 years. - Phantom.<\/p>\n<p>Bang Saray marina (&#8220;the Bang Saray Model&#8221;). A harbor for luxury vessels plus a beach nourishment project, announced by the Permanent Secretary of the Ministry of Transport on 15 May 2022 [31] [32]. There have been no feasibility study results, no EIA, and no news at all since that date - 4.2 years of silence. - Phantom.<\/p>\n<p><strong>Bali Hai Cape redevelopment.<\/strong> A cruise terminal, a recreation zone, a second pier, a skywalk, a department store, 38,000 m\u00b2 of commercial space, and demolition of the unfinished Waterfront building. Public hearings were held in September 2020 [30]. Nothing has been built. The Waterfront building, whose demolition was announced at the same time, is still standing. 5.8 years of silence. - Phantom.<\/p>\n<p>Bali Hai cruise terminal (a separate Marine Department project, 7.4 billion \u0e3f). The feasibility study was completed in June 2023, but on 24.08.2025 the PPP committee sent the studies back for revision and demanded a new EHIA [38] [39]. On 09.01.2026 department director-general Kritphet Chaichuai clarified that EHIA funding (16.861 million \u0e3f) had been allocated only for Samui, and that Pattaya &#8220;will be advanced after Samui&#8221; [40]. - Announced. The &#8220;opening 2030&#8221; timeline refers to Samui, not Pattaya.<\/p>\n<p><strong>Wongamat Beach Village.<\/strong> A 3-billion-\u0e3f Central Group mall on 13.5 rai in Wongamat, with phase 1 targeted for late 2022. Announced by Bangkok Post on 10.05.2022 [22]. No confirmation of an opening has surfaced for 2023-2026. In May 2026, a project seven times smaller was announced for Wongamat instead - Tops Wongamat, 430+ million \u0e3f, 4,711 m\u00b2 [23]. - Phantom (in its announced form). District: <a href=\"https:\/\/montmari-asia.com\/en\/area\/naklua-en\/\">Naklua<\/a>.<\/p>\n<p><strong>&#8220;Pattaya, the smart city.&#8221;<\/strong> depa&#8217;s list of certified smart cities (updated January 2026) shows 7 cities for the Eastern Region [75]. Pattaya is not among them. &#8220;PATTAYA Smart City&#8221; is listed as #16 in the promotion zone - meaning a submitted application, not certification. What is actually running is a municipal program with NT and Huawei: over 2,500 cameras, the Pattaya Connect app, 90 smart poles. With shortfalls: public camera streaming was promised to reach 1,500 and currently reaches 600. The first commercial phase of the smart poles (an agreement dated 09.07.2026) is AI-driven street advertising with viewership counting; public safety features have been pushed to &#8220;the next phase&#8221; [80]. - Partially confirmed, but not a mega-project.<\/p>\n<hr \/>\n<h2>What&#8217;s actually being built<\/h2>\n<p>No fanfare - just the dates.<\/p>\n<p><strong>U-Tapao airport, new terminal.<\/strong> The 50-year PPP contract was signed on 19.06.2020. Notice to Proceed was issued on 3 April 2026 - 5.5 years after the contract [46] [47]. This became possible because on 29.01.2026 operator UTA dropped the precondition requiring the high-speed rail to be in place. First phase: 3-4 million passengers a year, roughly 10 billion \u0e3f, 3-4 years to build, opening in 2031 [48]. UTA&#8217;s shareholders after restructuring: Bangkok Airways 40%, BTS Group 40%, STECON 20%.<\/p>\n<p>Worth noting separately: as of 29.07.2026, EECO&#8217;s official U-Tapao page still shows &#8220;Awaiting NTP&#8221; status and 0% progress. An official website isn&#8217;t always up to date - that&#8217;s also part of working with sources.<\/p>\n<p>U-Tapao&#8217;s second runway and taxiways. Contract signed 12.09.2025, contractor Italian-Thai, 13.14 billion \u0e3f (13,142,868,605.29 \u0e3f). Groundbreaking 28.11.2025, 1,095-day term, completion 29 October 2028 [49] [50]. The section for the high-speed rail tunnel has been excluded from the works - they&#8217;re waiting on the concessionaire, for up to 24 months.<\/p>\n<p>M7 off-ramp to U-Tapao. A 4-lane, 1.92 km elevated bridge plus widening of Sukhumvit Road from 4 to 8 lanes over 5.65 km. Cabinet approval 14.06.2022, contract with Sino-Thai (STECON) for 2.65 billion \u0e3f signed 19.09.2025. Per ADB data as of 06.05.2026: 98% contracted, 15% completed, land 100% acquired [55] [56]. Timeline: 2028.<\/p>\n<p>Laem Chabang port, phase 3. 110.9 billion \u0e3f, Terminal F. As of 29.05.2026, marine works are 95.57% complete, utility works 19.82%, overall progress 68.89% [98]. A fair caveat: sources disagree on the opening date for Terminal F1 - EECO says 2027, while PAT and the Ministry of Transport (05.06.2026) say 2031. We present both.<\/p>\n<p>Jomtien beach nourishment, phase 2. The most solidly documented project in the whole review: both a government contract and an exchange disclosure. Contract signed 24.01.2025 for 318.07 million \u0e3f, contractor Naowarat Patanakarn, disclosed via SET [68]. 2,800 m, 30-50 m wide, 900-day term. Progress over 30% as of 06.05.2026 [70], contractual completion 13.07.2027. Phase 1 (3.5 km, over 586 million \u0e3f) was handed over to the city in 2022, with an official ceremony on 26.01.2024. There is no phase 3 - the program was always designed as two phases.<\/p>\n<p>Columbia Pictures Aquaverse in <a href=\"https:\/\/montmari-asia.com\/en\/area\/na-jomtien-en\/\">Na-Jomtien<\/a>. A Sony Pictures-themed water park on the site of the former Cartoon Network Amazone. Announced in April 2021, promised to open in October 2021, actually opened 12 October 2022 [19]. A year late - but still a confirmed, operating facility.<\/p>\n<p><strong>Central Marina Outlet.<\/strong> A Central Pattana outlet mall with over 100 stores. Press release 27.11.2024, currently open [20].<\/p>\n<p>EECiti \/ EEC Capital City in <a href=\"https:\/\/montmari-asia.com\/en\/area\/huai-yai-en\/\">Huai Yai<\/a>. A new smart city; infrastructure worth 72 billion \u0e3f via PPP, 50-year concession. Approved by the \u0e01\u0e1e\u0e2d. (EEC Policy Committee) on 05.06.2026 [60] [61]. Precision is needed here: 0% built, with urban planning and feasibility studies underway, market sounding planned, tendering starting in early 2027, and construction of pilot plots in 2028. One clarification on land: 6,168 rai is the area ready for development after compensation is paid to current occupants - not land that has been &#8220;purchased.&#8221; A detailed breakdown is in a <a href=\"\/blog\/78482\/\">separate article<\/a>.<\/p>\n<p><strong>Drainage along the railway.<\/strong> Phase 1: 680.20 million \u0e3f, 90% complete as of 21.05.2025 [85]. Phase 2 (Khao Talo \u2192 Huai Yai canal): 269.9 million \u0e3f, contract runs through 02.01.2027, under construction [86].<\/p>\n<p><strong>Undergrounding of power lines.<\/strong> 3.1 billion \u0e3f across 9 routes in Pattaya. 6-7 routes completed; the Soi Buakhao route was cancelled 27.03.2021 because the street is too narrow [93]. The project is now in its ninth year.<\/p>\n<hr \/>\n<h2>Summary table<\/h2>\n<p>Key entries. A full table covering all 46 projects with sources for each line is in progress; available on request.<\/p>\n<p><em>Any row in the table can be cited directly - each has its own anchor.<\/em><\/p>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th>Project<\/th>\n<th>Area<\/th>\n<th>Progress<\/th>\n<th>Status as of 29.07.2026<\/th>\n<th>Verdict<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr id=\"p-utapao\">\n<td>U-Tapao airport, terminal<\/td>\n<td>Ban Chang (Rayong)<\/td>\n<td>construction started<\/td>\n<td>NTP 03.04.2026, phase 1 - 3-4M passengers, opening 2031<\/td>\n<td>Confirmed<\/td>\n<\/tr>\n<tr id=\"p-utapao-runway-2\">\n<td>U-Tapao second runway<\/td>\n<td>Ban Chang (Rayong)<\/td>\n<td>under construction<\/td>\n<td>completion 29.10.2028<\/td>\n<td>Confirmed<\/td>\n<\/tr>\n<tr id=\"p-m7-utapao\">\n<td>M7 off-ramp to U-Tapao<\/td>\n<td>Ban Chang (Rayong)<\/td>\n<td>15% completed<\/td>\n<td>timeline 2028<\/td>\n<td>Confirmed<\/td>\n<\/tr>\n<tr id=\"p-laem-chabang-3\">\n<td>Laem Chabang port, phase 3<\/td>\n<td>Laem Chabang<\/td>\n<td>68.89%<\/td>\n<td>marine works 95.57%; F1 - 2027 or 2031<\/td>\n<td>Confirmed<\/td>\n<\/tr>\n<tr id=\"p-jomtien-beach-2\">\n<td>Jomtien beach nourishment, phase 2<\/td>\n<td>Jomtien<\/td>\n<td>over 30%<\/td>\n<td>contractual completion 13.07.2027<\/td>\n<td>Confirmed<\/td>\n<\/tr>\n<tr id=\"p-aquaverse\">\n<td>Columbia Pictures Aquaverse<\/td>\n<td>Na-Jomtien<\/td>\n<td>open<\/td>\n<td>operating since 12.10.2022<\/td>\n<td>Confirmed<\/td>\n<\/tr>\n<tr id=\"p-central-marina-outlet\">\n<td>Central Marina Outlet<\/td>\n<td>Central Pattaya<\/td>\n<td>open<\/td>\n<td>operating<\/td>\n<td>Confirmed<\/td>\n<\/tr>\n<tr id=\"p-railway-drainage-1\">\n<td>Railway drainage, phase 1<\/td>\n<td>Nong Prue<\/td>\n<td>90%<\/td>\n<td>nearly complete<\/td>\n<td>Confirmed<\/td>\n<\/tr>\n<tr id=\"p-underground-power\">\n<td>Underground power lines<\/td>\n<td>Pattaya (citywide)<\/td>\n<td>6-7 of 9 routes<\/td>\n<td>in its 9th year, 1 route cancelled<\/td>\n<td>Confirmed, partially<\/td>\n<\/tr>\n<tr id=\"p-eeciti\">\n<td>EECiti \/ EEC Capital City<\/td>\n<td>Huai Yai, Banglamung<\/td>\n<td>0%<\/td>\n<td>planning stage, tendering 2027<\/td>\n<td>Announced<\/td>\n<\/tr>\n<tr id=\"p-aquatique\">\n<td>Aquatique District<\/td>\n<td>Central Pattaya<\/td>\n<td>0%<\/td>\n<td>4 Marriott\/IHG brands signed, phase 1 - 2031<\/td>\n<td>Announced<\/td>\n<\/tr>\n<tr id=\"p-universal-dreamworks\">\n<td>Universal \/ DreamWorks water park<\/td>\n<td>Central Pattaya<\/td>\n<td>0%<\/td>\n<td>preliminary agreement 08.07.2026, not disclosed on SET<\/td>\n<td>Announced<\/td>\n<\/tr>\n<tr id=\"p-hsr\">\n<td>&#8220;Three-airport&#8221; high-speed rail<\/td>\n<td>Nong Prue (station), whole region<\/td>\n<td>0 meters in 7 years<\/td>\n<td>concessionaire announced withdrawal 06.07.2026, decision expected August-September 2026<\/td>\n<td>Announced \/ Phantom as construction<\/td>\n<\/tr>\n<tr id=\"p-monorail\">\n<td>Monorail, green line<\/td>\n<td>Nong Prue, Central Pattaya, Pratumnak<\/td>\n<td>0%<\/td>\n<td>EIA &#8220;still being prepared&#8221; (20.11.2025)<\/td>\n<td>Announced \/ Phantom as construction<\/td>\n<\/tr>\n<tr id=\"p-cruise-terminal\">\n<td>Bali Hai cruise terminal<\/td>\n<td>Central Pattaya<\/td>\n<td>0%<\/td>\n<td>sent back for revision 24.08.2025, queued after Samui<\/td>\n<td>Announced<\/td>\n<\/tr>\n<tr id=\"p-flood-masterplan\">\n<td>Flood master plan, 26 billion \u0e3f<\/td>\n<td>Pattaya (citywide)<\/td>\n<td>tunnels 0%<\/td>\n<td>approved by Cabinet 23.02.2021, funds not allocated<\/td>\n<td>Announced<\/td>\n<\/tr>\n<tr id=\"p-harbor-pattaya\">\n<td>Harbor Pattaya<\/td>\n<td>Central Pattaya<\/td>\n<td>closed<\/td>\n<td>under renovation since November 2025, reopening unconfirmed<\/td>\n<td>Announced<\/td>\n<\/tr>\n<tr id=\"p-icon-siam\">\n<td>ICON SIAM in Jomtien<\/td>\n<td>Na-Jomtien<\/td>\n<td>0%<\/td>\n<td>silence since October 2023<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-legoland\">\n<td>Legoland \/ Peppa Pig \/ oceanarium<\/td>\n<td>Central Pattaya<\/td>\n<td>0%<\/td>\n<td>Facebook post 27.11.2021<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-disneyland-eec\">\n<td>&#8220;Disneyland in the EEC&#8221;<\/td>\n<td>Whole region<\/td>\n<td>0%<\/td>\n<td>minister&#8217;s statement 12.02.2026<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-cable-car\">\n<td>Cable car<\/td>\n<td>Central Pattaya, Pratumnak, Jomtien<\/td>\n<td>0%<\/td>\n<td>silence since 17.12.2022<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-bang-saray-marina\">\n<td>Bang Saray marina<\/td>\n<td>Bang Saray<\/td>\n<td>0%<\/td>\n<td>silence since 15.05.2022<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-bali-hai-redevelopment\">\n<td>Bali Hai Cape redevelopment<\/td>\n<td>Central Pattaya<\/td>\n<td>0%<\/td>\n<td>hearings September 2020, 5.8 years of silence<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-wongamat-beach-village\">\n<td>Wongamat Beach Village<\/td>\n<td>Naklua (Wongamat)<\/td>\n<td>0%<\/td>\n<td>silence since May 2022<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-jomtien-beach-3\">\n<td>Jomtien nourishment, phase 3<\/td>\n<td>Jomtien<\/td>\n<td>-<\/td>\n<td>program was always two phases<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-nong-yai-wwtp\">\n<td>Nong Yai wastewater plant expansion<\/td>\n<td>Nong Prue<\/td>\n<td>0%<\/td>\n<td>last hearing 09.05.2022<\/td>\n<td>Phantom<\/td>\n<\/tr>\n<tr id=\"p-worldmark\">\n<td>The Worldmark Na-Jomtien (MQDC)<\/td>\n<td>Na-Jomtien<\/td>\n<td>0%<\/td>\n<td>EIAs for 3 towers approved in 2023, construction not started<\/td>\n<td>Announced<\/td>\n<\/tr>\n<tr id=\"p-tops-wongamat\">\n<td>Tops Wongamat<\/td>\n<td>Naklua (Wongamat)<\/td>\n<td>0%<\/td>\n<td>announced 15.05.2026, over 430 million \u0e3f, 4,711 m\u00b2<\/td>\n<td>Announced<\/td>\n<\/tr>\n<tr id=\"p-eecmd\">\n<td>EECmd - Thammasat medical cluster<\/td>\n<td>Banglamung<\/td>\n<td>hub 0%<\/td>\n<td>only the hospital is funded; the hub has had no confirmation since October 2023<\/td>\n<td>Phantom as a hub \/ Confirmed as a hospital<\/td>\n<\/tr>\n<tr id=\"p-ao-pattaya-marina\">\n<td>Ao Pattaya Marina near Bali Hai<\/td>\n<td>Central Pattaya<\/td>\n<td>written off<\/td>\n<td>remains put up for auction 08.05.2026 for 500,000 \u0e3f<\/td>\n<td>Failure<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<hr \/>\n<h2>Two honest case studies<\/h2>\n<p>Picking apart other people&#8217;s promises is easy. It&#8217;s harder to show what can happen even to a project that actually got built. Two cases worth keeping in mind.<\/p>\n<h3>Case 1. Ao Pattaya Marina: built, lost, sold for 500,000 baht<\/h3>\n<p>A berth for 300+ boats near Bali Hai Cape - a Pattaya City Hall project worth over 300 million \u0e3f. This is not a phantom: the marina was genuinely built.<\/p>\n<p>Storms wrecked the structure, and legal disputes followed. On 8 May 2026 the city put the remains up for auction with a starting price of 500,000 \u0e3f - around 250 floating pontoon frames, pontoons, and a generator [34]. At the same time, the budget now includes funds to design a new berth for around 200 boats.<\/p>\n<p>Three hundred million baht turned into five hundred thousand. This isn&#8217;t about bad faith - it&#8217;s about the fact that &#8220;built&#8221; and &#8220;still operating ten years later&#8221; are two different things, especially on the coast. When someone shows you a property &#8220;by the marina&#8221; or &#8220;with a future marina view,&#8221; it&#8217;s worth asking who maintains that marina and what&#8217;s happened to it over the past five years.<\/p>\n<h3>Case 2. The flood of 24 July 2026 - in the exact same spots<\/h3>\n<p>Pattaya&#8217;s 26-billion-\u0e3f flood master plan really was approved: by the \u0e01\u0e19\u0e0a. committee on 28.12.2020, and by the Cabinet on 23.02.2021 [81].<\/p>\n<p>But that same resolution states that the city must find the funding itself - from its own revenue, loans, or PPP. Mayor Poramet, 06.08.2022: <em>&#8220;The Cabinet approved the project but didn&#8217;t provide the money - it told the city to borrow it themselves.&#8221;<\/em> Interest on such a loan would run about 170 million \u0e3f a year against the city&#8217;s annual budget of roughly 1.7 billion \u0e3f. Confirmed by the drainage department on 17.01.2025 and by the mayor on 26.02.2026.<\/p>\n<p>What has actually been built: drainage along the railway, phase 1 (680.20 million \u0e3f, 90%) and phase 2 (269.9 million \u0e3f, under construction). The main &#8220;crab claw&#8221; collector - around 3 billion \u0e3f - is at 0%. No separate Cabinet resolution for it has been found, even though the mayor called the project &#8220;already approved by the Cabinet&#8221; on 18.05.2026 [89] [90]. We&#8217;re recording that discrepancy, not picking the convenient version.<\/p>\n<p>In spring 2026 the city installed an AI water-management system: 43 sensors in pipes and 15 on roads, launching by the end of July [90].<\/p>\n<p>A checkpoint fact: on 24 July 2026 - five days before this fact-check was dated - Pattaya flooded again in exactly the same spots as in 2024 [91]: Sukhumvit, the road along the railway, Soi Khao Noi, Soi Khao Talo, Pattaya 3.<\/p>\n<p>The takeaway is simple and unwelcome: &#8220;26 billion approved&#8221; \u2260 &#8220;26 billion allocated.&#8221; And officially recognized flood hotspots are something you need to check at the specific address before a purchase, not after.<\/p>\n<hr \/>\n<h2>What this means for a buyer<\/h2>\n<h3>Five questions to ask the seller<\/h3>\n<p>1. Who said it? A statement from the head of a business association, a city official, or a journalist is not the same as a press release from the investor company. Several of the loudest claims in our review - &#8220;ICON SIAM in Jomtien,&#8221; &#8220;Disneyland in Chonburi,&#8221; the cable car - rest entirely on the words of people who haven&#8217;t put a single baht into them.<\/p>\n<p>2. What&#8217;s the date of the most recent news? The simplest and most reliable filter. A loud announcement from 2020-2022 that hasn&#8217;t been heard from since almost always means the project doesn&#8217;t exist. This filter rules out: the Bali Hai redevelopment (September 2020), Wongamat Beach Village (May 2022), the Bang Saray marina (May 2022), the Nong Yai wastewater plant (May 2022), and the cable car (December 2022).<\/p>\n<p>3. Is there an approved EIA? In Thailand, a major facility cannot legally be built without an approved EIA. Having an EIA is a strong sign the project has actually reached the funding stage. Not having one 3-5 years after the announcement is a verdict.<\/p>\n<p>4. Is there a signed contract, or better yet, an exchange disclosure? A public company is required to disclose material transactions. No SET disclosure means the deal is either immaterial or non-binding. AWC&#8217;s agreement with Universal (July 2026) was never disclosed on SET. The contractor disclosed the Jomtien nourishment contract - which is exactly why we&#8217;re confident about the nourishment project and not about Universal.<\/p>\n<p>5. &#8220;Approved&#8221; doesn&#8217;t mean &#8220;funded.&#8221; See the flood master plan case above. Cabinet approval without a budget line is intent, not money.<\/p>\n<h3>What to ask to see<\/h3>\n<ul>\n<li>A link to the primary source, not a real estate blog. A company press release, an agency&#8217;s decision, or a page on a government body&#8217;s website.<\/li>\n<li>The EIA number and status in the ONEP database (eia.onep.go.th) - for the actual property you&#8217;re buying, and for the &#8220;project nearby.&#8221;<\/li>\n<li>SET disclosure, if the investor is a public company.<\/li>\n<li>The date of the most recently confirmed news about the project. If the seller doesn&#8217;t know it, that&#8217;s the answer.<\/li>\n<\/ul>\n<h3>Why &#8220;they&#8217;re building X nearby&#8221; shouldn&#8217;t affect today&#8217;s price<\/h3>\n<p>The core point of this whole exercise is simple. You pay the money today, in full, while the promise comes true - if it ever does - at some unknown point in the future. The asymmetry is entirely against you.<\/p>\n<p>The high-speed rail has been written into Pattaya new-build advertising for all eight years. It hasn&#8217;t been built for a single meter, and in July 2026 the concessionaire announced it was pulling out of the project. People who paid extra for &#8220;close to the station&#8221; back in 2019 paid for a hypothesis - and were left with just the property itself.<\/p>\n<p>So our advice is to value an apartment or house based on what exists today: the property itself, the building, the developer, the neighborhood, transport access, engineering, and legal clean title. Treat &#8220;something will be built nearby&#8221; as a free bonus - nice if it happens, but not worth paying extra for separately.<\/p>\n<p>And the flip side: if a seller uses a project we&#8217;ve flagged above as a Phantom in their pitch, that&#8217;s a cheap way to test how carefully they work with facts in general. The information is public. Not knowing it in mid-2026 says something about the quality of their work.<\/p>\n<hr \/>\n<p>We go through this project by project when <a href=\"\/services\/pomoshh-v-pokupke-nedvizhimosti\/\">helping clients select property<\/a>: what&#8217;s actually being built nearby, what&#8217;s under construction with a contract and a deadline, and what exists only in a presentation. If you need a fact-check on a specific property or area, get in touch - we&#8217;ll go through the sources.<\/p>\n<p>You can view the neighborhoods from above in our <a href=\"\/drones\/\">drone footage section<\/a>, compare residential projects in our <a href=\"\/projects\/\">project catalog<\/a>, and read a breakdown of locations in our article on <a href=\"\/blog\/78483\/\">Pattaya&#8217;s districts<\/a>.<\/p>\n<hr \/>\n<h2>Other articles in this series<\/h2>\n<ul>\n<li><a href=\"\/blog\/78477\/\">Real Estate in Thailand: How to Find Out What Will Be Built Near Your Home<\/a><\/li>\n<li><a href=\"\/blog\/78478\/\">A Sea-View Condo in Thailand: How to Know Your View Won&#8217;t Be Built Over<\/a><\/li>\n<li><a href=\"\/blog\/78479\/\">Investing in Thailand: Is Buying a Condo for Regional Growth Worth It<\/a><\/li>\n<li><a href=\"\/blog\/78480\/\">U-Tapao Airport: When It Opens and Whether to Buy in South Pattaya<\/a><\/li>\n<li><a href=\"\/blog\/78481\/\">The High-Speed Rail to Pattaya: Is It Worth Paying Extra for a Home Near the Station<\/a><\/li>\n<li><a href=\"\/blog\/78482\/\">Buying a House in Huai Yai, Thailand: What&#8217;s Known About the New City Near Pattaya<\/a><\/li>\n<li><a href=\"\/blog\/78483\/\">Pattaya&#8217;s Districts: Where to Live and What to Buy - A Guide to Eight Locations<\/a><\/li>\n<li><a href=\"\/blog\/78484\/\">How to Buy Property in Thailand: A 12-Point Checklist<\/a><\/li>\n<\/ul>\n<hr \/>\n<h2>Sources<\/h2>\n<p>All links verified on 29.07.2026.<\/p>\n<p>ICON SIAM \/ Na-Jomtien<\/p>\n<ol>\n<li value=\"1\">REm Magazine, &#8220;Major investment plans for Pattaya and Jomtien, including Icon Siam,&#8221; 24.05.2019 - the original source of the rumor, a retelling of Nation TV. <a href=\"https:\/\/remthailand.asia\/major-investment-plans-for-pattaya-jomtien-including-icon-siam\/\">Link<\/a><\/li>\n<li value=\"2\">Sisaran Group, &#8220;Icon Siam shopping center coming soon,&#8221; 01.02.2020 - an interested party, openly admits there was no official announcement. <a href=\"https:\/\/www.sisaran.com\/en\/2020\/02\/01\/icon-siam-shopping-center-coming\/\">Link<\/a><\/li>\n<li value=\"3\">Siam Piwat, official website - Pattaya is not mentioned. <a href=\"https:\/\/www.siampiwat.com\/\">Link<\/a><\/li>\n<li value=\"4\">Bangkok Post, &#8220;MQDC to launch new project in Pattaya,&#8221; October 2023 - anonymous source on the &#8220;Iconsiam Pattaya mall&#8221;; EIA for the 3 Worldmark towers. <a href=\"https:\/\/www.bangkokpost.com\/property\/2657729\/mqdc-to-launch-new-project-in-pattaya\">Link<\/a><\/li>\n<\/ol>\n<p>Aquatique \/ AWC \/ Universal<\/p>\n<ol>\n<li value=\"5\">Thansettakij, on the launch of the 10-billion-\u0e3f Aquatique, 27.08.2021. <a href=\"https:\/\/www.thansettakij.com\/business\/493539\">Link<\/a><\/li>\n<li value=\"6\">AWC, press release on Kimpton Pattaya, 20.03.2023. <a href=\"https:\/\/www.assetworldcorp-th.com\/en\/newsroom\/news-activities\/596\">Link<\/a><\/li>\n<li value=\"7\">AWC, press release on The Ritz-Carlton at Aquatique, 28.01.2026. <a href=\"https:\/\/www.assetworldcorp-th.com\/en\/newsroom\/news-activities\/1041\">Link<\/a><\/li>\n<li value=\"8\">Thailand Hotel News, on Moxy Pattaya (400 rooms, Q1 2033), 25.07.2026. <a href=\"https:\/\/thailandhotel.news\/awc-and-marriott-deal-adds-400-key-moxy-pattaya-to-aquatique-project-bringing-total-to-4-hotels-and-1400-rooms\/\">Link<\/a><\/li>\n<li value=\"9\">Bangkok Post, &#8220;AWC to roll out B1.9bn hotel in Pattaya,&#8221; 2021 - Vignette as the first phase. <a href=\"https:\/\/www.bangkokpost.com\/business\/2172083\/awc-to-roll-out-b1-9bn-hotel-in-pattaya\">Link<\/a><\/li>\n<li value=\"10\">Property Connection Thailand, on phase 1 in 2031, 02.02.2026. <a href=\"https:\/\/propertyconnectionthailand.com\/ritz-carlton-pattaya-awc-aquatique-project\/\">Link<\/a><\/li>\n<li value=\"11\">AWC, &#8220;AWC and Universal Destinations &amp; Experiences to Collaborate\u2026,&#8221; 08.07.2026 - the primary source, with the &#8220;preliminary agreement&#8221; wording. <a href=\"https:\/\/www.assetworldcorp-th.com\/en\/newsroom\/news-activities\/1107\">Link<\/a><\/li>\n<li value=\"12\">AWC, Company Disclosures section on SET - no deal with Universal listed. <a href=\"https:\/\/www.assetworldcorp-th.com\/en\/investor-relations\/newsroom\/company-disclosures\">Link<\/a><\/li>\n<\/ol>\n<p>Legoland \/ Peppa Pig \/ oceanarium<\/p>\n<ol>\n<li value=\"13\">The Pattaya News, 27.11.2021 - the original source of the rumors, citing the Facebook page \u0e17\u0e35\u0e48\u0e0b\u0e38\u0e01\u0e2b\u0e31\u0e27\u0e19\u0e2d\u0e19. <a href=\"https:\/\/thepattayanews.com\/2021\/11\/27\/aquatique-district-pattaya-mega-project-is-planned-to-be-developed-on-pattaya-beach\/\">Link<\/a><\/li>\n<li value=\"14\">Merlin Entertainments, newsroom - no projects in Thailand. <a href=\"https:\/\/www.merlinentertainments.biz\/\">Link<\/a><\/li>\n<li value=\"16\">Merlin, on the second Peppa Pig park in the US (Dallas), 2025. <a href=\"https:\/\/www.merlinentertainments.biz\/newsroom\/news-releases\/2025\/peppa-pig-dallas-fort-worth\/\">Link<\/a><\/li>\n<li value=\"17\">TTG Asia, on the Peppa Pig park in Shanghai, 30.04.2024. <a href=\"https:\/\/www.ttgasia.com\/2024\/04\/30\/largest-peppa-pig-outdoor-theme-park-to-open-in-shanghai\/\">Link<\/a><\/li>\n<\/ol>\n<p>&#8220;Disneyland,&#8221; retail, marinas, cable car<\/p>\n<ol>\n<li value=\"18\">Nation Thailand, &#8220;Disneyland Thailand idea returns with THB300 billion EEC mixed-use proposal,&#8221; 12.02.2026. <a href=\"https:\/\/www.nationthailand.com\/blogs\/business\/investment\/40062428\">Link<\/a><\/li>\n<li value=\"19\">Columbia Pictures Aquaverse - opened 12.10.2022; announcement by Sony \/ Amazon Falls, Deadline, April 2021. <a href=\"https:\/\/deadline.com\/2021\/04\/sony-pictures-opening-aquaverse-theme-park-thailand-amazon-falls-1234728965\/\">Link<\/a><\/li>\n<li value=\"20\">Central Pattana, press release on Central Marina Outlet, 27.11.2024. <a href=\"https:\/\/www.centralpattana.co.th\/en\/shopping\/shopping-update\/lifestyle-activities\/1286\/\">Link<\/a><\/li>\n<li value=\"22\">Bangkok Post, &#8220;Central Group readies B3bn Pattaya mall,&#8221; 10.05.2022 - Wongamat Beach Village. <a href=\"https:\/\/www.bangkokpost.com\/business\/2307298\/central-group-readies-b3bn-pattaya-mall\">Link<\/a><\/li>\n<li value=\"23\">On Tops Wongamat (430+ million \u0e3f), 15.05.2026. <a href=\"https:\/\/huahin.localplus.city\/2026\/05\/15\/central-group-invests-730-million-baht-in-pattaya-and-phuket-community-malls\/\">Link<\/a><\/li>\n<li value=\"30\">Bangkok Post, &#8220;Pattaya mega-project approved at public hearing,&#8221; September 2020 - Bali Hai redevelopment. <a href=\"https:\/\/www.bangkokpost.com\/thailand\/general\/1981867\/pattaya-mega-project-approved-at-public-hearing\">Link<\/a><\/li>\n<li value=\"31\">Bangkok Post, &#8220;New marina plan eyes big spenders,&#8221; 15.05.2022 - Bang Saray. <a href=\"https:\/\/www.bangkokpost.com\/business\/2310070\/new-marina-plan-eyes-big-spenders\">Link<\/a><\/li>\n<li value=\"32\">The Pattaya News, on the &#8220;Bang Saray Model,&#8221; 15.05.2022. <a href=\"https:\/\/thepattayanews.com\/2022\/05\/15\/thai-marine-department-accelerates-bang-saray-model-study-to-potentially-boost-domestic-tourism-in-chonburi-with-a-port-beach-expansion\/\">Link<\/a><\/li>\n<li value=\"34\">\u0e2d\u0e1b\u0e17.\u0e19\u0e34\u0e27\u0e2a\u0e4c, auction of the Ao Pattaya Marina remains, 08.05.2026. <a href=\"https:\/\/www.opt-news.com\/news\/58874\">Link<\/a><\/li>\n<li value=\"35\">Pattaya Mail, &#8220;With trams, monorail stalled, Pattaya now looks to cable cars,&#8221; 17.12.2022. <a href=\"https:\/\/www.pattayamail.com\/news\/with-trams-monorail-stalled-pattaya-now-looks-to-cable-cars-419314\">Link<\/a><\/li>\n<li value=\"36\">The Pattaya News, &#8220;Cable car system proposed by Pattaya city officials,&#8221; 15.12.2022. <a href=\"https:\/\/thepattayanews.com\/2022\/12\/15\/cable-car-system-proposed-by-pattaya-city-officials-to-solve-pattaya-traffic-problems\/\">Link<\/a><\/li>\n<\/ol>\n<p>Cruise terminal, monorail<\/p>\n<ol>\n<li value=\"38\">Nation Thailand, &#8220;Study plans for Samui and Pattaya cruise terminals sent back for review,&#8221; 24.08.2025. <a href=\"https:\/\/www.nationthailand.com\/blogs\/news\/policy\/40054429\">Link<\/a><\/li>\n<li value=\"39\">Thansettakij, on the studies being sent back for revision, 24.08.2025. <a href=\"https:\/\/www.thansettakij.com\/economy\/megaproject\/636704\">Link<\/a><\/li>\n<li value=\"40\">MGR Online, EHIA budget allocated only for Samui, 09.01.2026. <a href=\"https:\/\/mgronline.com\/business\/detail\/9690000002515\">Link<\/a><\/li>\n<li value=\"51\">Matichon, on the monorail&#8217;s green line - the last confirmed development, 20.11.2025. <a href=\"https:\/\/www.matichon.co.th\/economy\/news_5466204\">Link<\/a><\/li>\n<li value=\"53\">Bangkok Post, &#8220;Pattaya approves monorail plan,&#8221; 05.09.2024 - expropriation of 635 plots. <a href=\"https:\/\/www.bangkokpost.com\/thailand\/general\/2860151\/pattaya-approves-monorail-plan\">Link<\/a><\/li>\n<\/ol>\n<p>High-speed rail and U-Tapao<\/p>\n<ol>\n<li value=\"41\">The Nation, &#8220;Airport rail deal faces July 15 review after eight-year delay and 21.8bn-baht investment,&#8221; 11.07.2026. <a href=\"https:\/\/www.nationthailand.com\/business\/investment\/40068498\">Link<\/a><\/li>\n<li value=\"42\">The Nation, &#8220;CP seeks termination of three-airport high-speed rail contract,&#8221; 09.07.2026. <a href=\"https:\/\/www.nationthailand.com\/news\/general\/40068444\">Link<\/a><\/li>\n<li value=\"43\">MGR Online, on the switch to a medium-speed 160 km\/h line, 05.07.2026. <a href=\"https:\/\/mgronline.com\/business\/detail\/9690000064683\">Link<\/a><\/li>\n<li value=\"44\">Thansettakij, on the four decision options, 15.07.2026. <a href=\"https:\/\/www.thansettakij.com\/economy\/megaproject\/664034\">Link<\/a><\/li>\n<li value=\"46\">\u0e10\u0e32\u0e19\u0e40\u0e28\u0e23\u0e29\u0e10\u0e01\u0e34\u0e08, on the U-Tapao construction start on 03.04.2026 and the first phase for 3 million passengers, 27.03.2026. <a href=\"https:\/\/www.thansettakij.com\/business\/tourism\/655112\">Link<\/a><\/li>\n<li value=\"47\">The Nation, &#8220;U-Tapao Airport project to kick off on April 3,&#8221; 2026. <a href=\"https:\/\/www.nationthailand.com\/business\/economy\/40063002\">Link<\/a><\/li>\n<li value=\"48\">MGR Online, on the NTP issuance and the opening of the first phase, 26.02.2026. <a href=\"https:\/\/mgronline.com\/business\/detail\/9690000019118\">Link<\/a><\/li>\n<li value=\"49\">MGR Online, on the start of construction of the second runway, 28.11.2025. <a href=\"https:\/\/mgronline.com\/business\/detail\/9680000114369\">Link<\/a><\/li>\n<li value=\"50\">\u0e02\u0e48\u0e32\u0e27\u0e2b\u0e38\u0e49\u0e19, on the ITD contract for runway 2, 12.09.2025. <a href=\"https:\/\/www.kaohoon.com\/news\/782098\">Link<\/a><\/li>\n<\/ol>\n<p>M7, EECiti, infrastructure<\/p>\n<ol>\n<li value=\"55\">ADB, &#8220;Climate-Resilient Connectivity for the EEC Project: Intercity Motorway No.7,&#8221; updated 11.06.2026. <a href=\"https:\/\/www.adb.org\/projects\/56223-001\/main\">Link<\/a><\/li>\n<li value=\"56\">Thailand Construction News, on the 2.65-billion-\u0e3f Sino-Thai contract, 06.08.2025. <a href=\"https:\/\/thailand-construction.com\/sino-thai-stecon-signs-contract-to-construct-2-65-billion-baht-elevated-motorway-link-to-u-tapao-international-airport-three-year-contract-period\/\">Link<\/a><\/li>\n<li value=\"60\">\u0e42\u0e1e\u0e2a\u0e15\u0e4c\u0e17\u0e39\u0e40\u0e14\u0e22\u0e4c, on the \u0e01\u0e1e\u0e2d. decision on EECiti (72 billion \u0e3f, PPP 2027), 08.06.2026. <a href=\"https:\/\/www.posttoday.com\/smart-city\/743535\">Link<\/a><\/li>\n<li value=\"61\">Pattaya Mail, &#8220;New sports, entertainment and smart city hub planned for EEC,&#8221; 07.06.2026. <a href=\"https:\/\/www.pattayamail.com\/news\/new-sports-entertainment-and-smart-city-hub-planned-for-eec-552491\">Link<\/a><\/li>\n<li value=\"68\">SET, NWR&#8217;s disclosure of the contract for phase 2 of the Jomtien nourishment (318.07 million \u0e3f), 24.01.2025. <a href=\"https:\/\/www.set.or.th\/th\/market\/news-and-alert\/newsdetails?id=93373601&#038;symbol=NWR\">Link<\/a><\/li>\n<li value=\"70\">Pattaya Mail, on phase 2 nourishment progress - 30%, 07.05.2026. <a href=\"https:\/\/www.pattayamail.com\/news\/pattaya-pushes-ahead-with-jomtien-beach-sand-nourishment-phase-2-as-project-hits-30-progress-547748\">Link<\/a><\/li>\n<\/ol>\n<p>Smart city, water, floods<\/p>\n<ol>\n<li value=\"75\">depa, list of certified smart cities - Pattaya is not on it, updated January 2026. <a href=\"https:\/\/www.depa.or.th\/th\/smart-city-plan\/existing-smart-city\">Link<\/a><\/li>\n<li value=\"80\">Nation Thailand, on the NT and Security Pitch agreement for 90 poles (first phase - AI advertising), 12.07.2026. <a href=\"https:\/\/www.nationthailand.com\/news\/general\/40054317\">Link<\/a><\/li>\n<li value=\"81\">Cabinet resolution of 23.02.2021 on the 26-billion-\u0e3f flood master plan, RYT9. <a href=\"https:\/\/www.ryt9.com\/s\/cabt\/3202478\">Link<\/a><\/li>\n<li value=\"82\">Prachachat, the mayor on how the Cabinet approved the project but didn&#8217;t fund it, 06.08.2022. <a href=\"https:\/\/www.prachachat.net\/local-economy\/news-1005367\">Link<\/a><\/li>\n<li value=\"85\">\u0e2d\u0e1b\u0e17.\u0e19\u0e34\u0e27\u0e2a\u0e4c, drainage phase 1 - 90%, 21.05.2025. <a href=\"https:\/\/www.opt-news.com\/news\/50242\">Link<\/a><\/li>\n<li value=\"86\">Pattaya Mail, on phase 2 of the railway drainage, 18.04.2025. <a href=\"https:\/\/www.pattayamail.com\/news\/pattaya-pushes-forward-with-phase-2-of-eastern-railway-road-drainage-project-to-prevent-flooding-498045\">Link<\/a><\/li>\n<li value=\"89\">MGR Online, \u0e01\u0e19\u0e0a. &#8220;preparing to review&#8221; the &#8220;crab claw&#8221; collector, 18.03.2025. <a href=\"https:\/\/mgronline.com\/politics\/detail\/9680000025991\">Link<\/a><\/li>\n<li value=\"90\">The Pattaya News, mayor inspects the AI water-management system, 18.05.2026. <a href=\"https:\/\/thepattayanews.com\/2026\/05\/18\/pattaya-mayor-inspects-progress-of-smart-water-management-system-to-tackle-flooding\/\">Link<\/a><\/li>\n<li value=\"91\">Pattaya Mail, &#8220;Pattaya faces long monsoon battle with more heavy rain ahead,&#8221; 27.07.2026 - the flood of 24.07.2026 in the same spots. <a href=\"https:\/\/www.pattayamail.com\/news\/pattaya-faces-long-monsoon-battle-with-more-heavy-rain-ahead-559017\">Link<\/a><\/li>\n<li value=\"93\">Pattaya Mail, &#8220;PEA cancels Pattaya Soi Buakhao wire-burying plan,&#8221; 29.03.2021. <a href=\"https:\/\/www.pattayamail.com\/news\/pea-cancels-pattaya-soi-buakhao-wire-burying-plan-other-projects-to-finish-by-year-end-348784\">Link<\/a><\/li>\n<li value=\"98\">\u0e01\u0e23\u0e21\u0e1b\u0e23\u0e30\u0e0a\u0e32\u0e2a\u0e31\u0e21\u0e1e\u0e31\u0e19\u0e18\u0e4c (PRD), on the progress of Laem Chabang port phase 3, 05.06.2026. <a href=\"https:\/\/www.prd.go.th\/th\/content\/category\/detail\/id\/33\/iid\/509728\">Link<\/a><\/li>\n<\/ol>\n<p><em>This material is for informational purposes only and does not constitute investment advice. Data verified as of 29 July 2026. Some statuses will change: the decision on the high-speed rail is expected in August-September 2026, the EECiti sports complex feasibility study in August 2026, and debates on the entertainment complex law in the third quarter of 2026.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What you need to know in 30 seconds We checked 46 projects and rumors used between 2018 and 2026 to sell real estate in Pattaya, Jomtien and Bang Saray. Result: 19 confirmed, 16 announced, 11 phantoms. ICON SIAM in Jomtien is a phantom. The 2019 primary source is not an investor but the president of [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":98483,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"_mm_seo_title":"Thailand Property: ICON SIAM and Other Phantom Projects","_mm_seo_description":"We checked 46 projects used to sell Pattaya condos - ICON SIAM, Legoland, the high-speed rail - to see what's backed by contract vs. just a Facebook post.","footnotes":""},"categories":[328],"tags":[],"class_list":["post-98287","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-property"],"acf":[],"_links":{"self":[{"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/posts\/98287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/comments?post=98287"}],"version-history":[{"count":0,"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/posts\/98287\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/media\/98483"}],"wp:attachment":[{"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/media?parent=98287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/categories?post=98287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montmari-asia.com\/en\/wp-json\/wp\/v2\/tags?post=98287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}